{"id":17015,"date":"2026-04-28T09:47:26","date_gmt":"2026-04-28T06:47:26","guid":{"rendered":"https:\/\/tehni.eu\/?p=17015"},"modified":"2026-05-14T09:47:46","modified_gmt":"2026-05-14T06:47:46","slug":"driving-measurable-impact-through-responsible-investment","status":"publish","type":"post","link":"https:\/\/tehni.eu\/fr\/driving-measurable-impact-through-responsible-investment\/","title":{"rendered":"G\u00e9n\u00e9rer un impact mesurable gr\u00e2ce \u00e0 l'investissement responsable"},"content":{"rendered":"<p>Chez TEHNi S.A., nous mettons en place un syst\u00e8me photovolta\u00efque sur le toit de nos sites de production, d'une puissance nominale de 300 kW. Ce projet devrait permettre de r\u00e9aliser des \u00e9conomies d'\u00e9nergie annuelles de 459 495 kWh et contribuer \u00e0 une r\u00e9duction de 165 tonnes d'\u00e9quivalent CO\u2082 par an, renfor\u00e7ant ainsi notre efficacit\u00e9 op\u00e9rationnelle tout en minimisant notre empreinte environnementale.<\/p>\n\n\n\n<p>This initiative is fully aligned with the national target of reducing emissions by 30% by 2030, in accordance with the Greek Climate Law (L. 4936\/2022), reinforcing our proactive approach to regulatory compliance and climate responsibility.<\/p>\n\n\n\n<p>En tant qu'organisation certifi\u00e9e ISO 14001 et pleinement align\u00e9e sur les principes ESG, nous int\u00e9grons syst\u00e9matiquement la gestion environnementale dans notre strat\u00e9gie d'entreprise, faisant de la durabilit\u00e9 un pilier central de la cr\u00e9ation de valeur \u00e0 long terme.<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" width=\"1000\" height=\"638\" src=\"https:\/\/tehni.eu\/wp-content\/uploads\/Tehni-Green-Energy.webp\" alt=\"\" class=\"wp-image-17014\" srcset=\"https:\/\/tehni.eu\/wp-content\/uploads\/Tehni-Green-Energy.webp 1000w, https:\/\/tehni.eu\/wp-content\/uploads\/Tehni-Green-Energy-768x490.webp 768w, https:\/\/tehni.eu\/wp-content\/uploads\/Tehni-Green-Energy-18x12.webp 18w, https:\/\/tehni.eu\/wp-content\/uploads\/Tehni-Green-Energy-600x383.webp 600w\" sizes=\"(max-width: 1000px) 100vw, 1000px\" \/><\/figure>","protected":false},"excerpt":{"rendered":"<p>At TEHNi S.A., we are implementing a rooftop photovoltaic system at our production facilities, with a nominal power of 300 kW. The project is expected to deliver annual energy savings of 459,495 kWh and contribute to a reduction of 165 tons CO\u2082-eq per year, strengthening our operational efficiency while minimizing our environmental footprint. This initiative [&hellip;]<\/p>\n","protected":false},"author":23,"featured_media":17014,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[89],"tags":[],"class_list":["post-17015","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/posts\/17015","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/comments?post=17015"}],"version-history":[{"count":0,"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/posts\/17015\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/media\/17014"}],"wp:attachment":[{"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/media?parent=17015"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/categories?post=17015"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tehni.eu\/fr\/wp-json\/wp\/v2\/tags?post=17015"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}